期刊文献+

贵州兴旺煤矿开采地表塌陷预测方法探讨 被引量:1

Study on Prediction Methods of Surface Subsidence Caused by Coal Mining in Xingwang Caol in Guizhou Province
下载PDF
导出
摘要 以贵州六枝特区兴旺煤矿地表塌陷为例,采用概率积分法作为地表移动及变形预测的模式,选取下沉系数、主要影响角、主要影响半径和水平移动系数为地表移动参数,计算得出井田开采后地表最大下沉值为1 425.3mm,影响面积约1.85km2。并比较说明除移动参数外各类煤柱的留设也是其中需要考虑的因素。 Setting surface subsidence in Xingwang coal mine in Liuzhi area in Guizhou province as an exam- ple, by using probability integral method as surface movement and deformation of a predictable pattern, selecting the sinking coefficient, impact angle, main radius of influence and level of mobility coefficient for the surface movement parameters, maximum sinking value after the coal mining is 425.3 mm, and the influencing square is about 1.85km2. In addition to the movement parameters, various types of coal pillars have also been considered as an influencing factor.
作者 隋建红 李超
出处 《山东国土资源》 2012年第6期25-27,共3页 Shandong Land and Resources
关键词 煤矿 地表塌陷 预测 影响因素 下沉参数 兴旺煤矿 贵州六枝特区 Coal mines surface subsidence forecasts influencing factors sinking parameters Xingwangcoal mine Liuzhi area in Guizhou province
  • 相关文献

参考文献3

二级参考文献13

共引文献29

同被引文献13

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部