期刊文献+

浦东国际机场北通道(申江路—主进场路)新建工程主线高架桥梁现浇连续箱梁施工

Construction of Cast-in-situ Continuous Box Girder of Elevated Bridge in Newly Built Engineering Line of Pudong International Airport North Channel(Shenjiang Road Main Airport Road)
下载PDF
导出
摘要 浦东国际机场北通道作为中环线向东延伸线,是连接中环线和上海浦东国际机场间的快速通道。着重阐述北通道14标主线高架桥梁现浇连续箱梁的施工方法及技术保证措施,可为同类工程提供参考。 The North Channel of Pudong International Airport,as the eastward extension line of the Middle Ring Line,is the express channel to connect the Middle Ring Line with Shanghai Pudong International Airport.The article stresses and sets forth the construction method and the technical guarantee measures of the cast-in-situ continuous box girder of the elevated bridge in Bid 14 of the main line of the North Channel,which can be referred for the same projects.
作者 赵健
出处 《城市道桥与防洪》 2012年第6期203-205,17,共3页 Urban Roads Bridges & Flood Control
关键词 高架桥 现浇连续箱梁 施工 浦东国际机场北通道 elevated bridge,cast-in-situ continuous box girder,construction,North Channel of Pudong International Airport
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部