期刊文献+

基于拆迁-建设-运营的公路建设项目进度成本优化研究

Study on Optimization of Road Construction Project Schedule and Cost Based on Demolition-Construction-Operation
下载PDF
导出
摘要 该文提出了基于拆迁-建设-运营的公路建设项目进度成本优化原理,运用MATLAB软件进行了拆迁-建设-运营的进度成本优化的系统仿真,并用实际案例验证了其适用性与有效性。 The paper puts forward the optimization principle of road construction project schedule and cost based on demolition-construction-operation, uses the software MATLAB for the system simulation of the schedule and cost optimization based on demolition-construction-operation, and verifies its applicability and effectiveness by the practical cases.
作者 何美丽 刘浪
出处 《城市道桥与防洪》 2012年第7期311-313,26,共3页 Urban Roads Bridges & Flood Control
关键词 公路建设项目 拆迁 建设 运营 优化 仿真 road construction projects, demolition, construction, operation, optimization, simulation
  • 相关文献

参考文献3

二级参考文献20

  • 1杨耀红,汪应洛,王能民.工程项目工期成本质量模糊均衡优化研究[J].系统工程理论与实践,2006,26(7):112-117. 被引量:55
  • 2玄光男 程润伟.遗传算法与工程设计[M].北京:科学出版社,2000..
  • 3Mckim R,Hegazy T,Attalla M.Project performance control in construction projects[J].Journal of Construction Engineering and Management,2000,126(2):137-141.
  • 4Do Ba Khang,Yin Mon Myint.Time,cost and quality trade-off in project management:A case study[J].International Journal of Project Management,1999,17(4):249-256.
  • 5Babu A J G,Suresh N.Project management with time,cost and quality considerations[ J ].European Journal of Operational Research,1996,88(2):320-327.
  • 6Liem Tran,Lucien Duckstein.Comparison of fuzzy numbers using a fuzzy distance measure[ J ].Fuzzy Sets and Systems,2002,130:331-341.
  • 7McKim R, Hegazy T, Attalla M. Project performance control in reconstruction projects[J]. Journal of Construction Engineering and Management, 2000, 126 (2): 137-141.
  • 8Rwelamila P D, et al. Total systems intervention: An integrated approach to time, cost and quality mawgement[J]. Construction Management and Economics, 1995, 13: 235-241.
  • 9Babu A J G, Suresh N. Project management with time, cost, and quality considerations[ J]. European Journal of Operational Research, 1996, 88 (2): 320-327.
  • 10Do Ba Khang, Yin Mon Myint. Time, cost and quality trade-off in project management: A case study[J]. International Journal of Project Management, 1999, 17(4): 249-256.

共引文献191

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部