深基坑基岩裂隙水降排措施及抗浮锚杆后施工法 被引量:7

Bedrock Fissure Water Drainage and Anti-floating Rock Bolt Post-construction Method in Deep Foundation Excavation
下载PDF
导出
摘要 在四川地区,超高层建筑施工中一般都存在深基坑和抗浮锚杆施工。由于深基坑基岩裂隙水的处理存在难度,基坑四周常规降水井的降水效果只能体现在强透水层。抗浮锚杆施工中,传统方法存在锚杆后期挖土损坏、不利于垫层施工等问题。介绍了深基坑基岩裂隙水的处理办法以及抗浮锚杆后施工法,有效解决了深基坑基岩裂隙水降水难的问题以及传统抗浮锚杆施工存在的诸多不足。 Deep foundation excavations and anti-floating anchor bolt constructions are common in super high-rise buildings in Sichuan. Because of the difficulty in bedrock fissure water treatment, the effect of normal dewater well is not very good. In the traditional anti-floating rock bolt construction method, anchors are subjected to damage in the later phase of construction, which is harmful to the bed course construction. This paper introduced the treatment for bedrock fissure water and the post-construction method for anti-floating rock bolts. The method proposed can effectively solve the difficulties mentioned above.
出处 《施工技术》 CAS 北大核心 2012年第7期25-27,共3页 Construction Technology
关键词 地下工程 高层建筑 深基坑 基岩裂隙水 抗浮锚杆 降水 underground tall buildings deep foundation excavation bedrock fissure water anti-floatanchor dewatering
  • 相关文献

参考文献6

二级参考文献1

  • 1余志成,施文华深基坑支护设计与施工[M].北京:中国建筑工业出版社.1999.

共引文献101

同被引文献21

引证文献7

二级引证文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部