精准测量点位控制隧道超欠挖技术

The Accurate Measuring Point Position Controlling Tunnel Ultra or Owe Digging Technical Practice
下载PDF
导出
摘要 通过对花博山2号隧道超欠挖问题的研究,发现其存在的主要影响因素是测量放样点位随意问题。对传统测量放样法进行改进,提出以设计轮廓图上主要曲线控制点为测量放样点,精确计算其点位坐标,必要时引进辅助控制点,从而减少了人为主观因素,提高了描绘与设计轮廓线的吻合度。实践表明,光面爆破效果达到预期,使开挖轮廓一次成型,有效地控制了隧道的超欠挖。 Accurate positioning method to control over or insufficient excavation for tunnels investigation to Huaboshan No. 2 Tunnel shows that random selection of lofting control point caused the over or insufficient excavation. The authors improved the traditional lofting method by proposing that the main curve control points in the design outline should be used as lofting control points. Their coordinates should be accurately calculated and auxiliary points should be used if necessary. The method adopted minimized the influence of subjective factors and improved the accuracy. Practice shows that smooth blasting effect was achieved and ultra or insufficient excavation was under control.
出处 《施工技术》 CAS 北大核心 2012年第7期82-84,89,共4页 Construction Technology
关键词 隧道工程 超欠挖 测量放样 轮廓线 控制点 tunnels ultra or owe digging measurement contour line control points
  • 相关文献

参考文献3

  • 1王水善.浅谈隧道施工中超欠挖问题[J].西部探矿工程,2000,12(5):89-90. 被引量:3
  • 2张项峰,张正禄.隧道工程测量[M].北京:测绘出版社,1998.
  • 3中国有色金属工业协会.GB50026-2007工程测量规范[S].北京:中国计划出版社,2008.