摘要 为了确保册亨岩架大桥拆除爆破的顺利进行,在拆除爆破前基于有限元软件ANSYS/LS-DYNA,分别考虑了爆破过程中钢筋和混凝土的力学差异,建立了分离式共节点模型,对所提出的爆破方案进行了预演。数值模拟结果表明,所采取的浅孔爆破与深孔爆破相结合的方案是完全可行的,因此确定利用此方案进行爆破施工。通过与实际爆破过程进行对比分析,认为数值模拟技术可对爆破方案进行验证并优化,能够有效地指导爆破施工,具有重要的理论意义和工程实用价值。 In order to ensure Ceheng ledges bridge demolition blasting is carried out smoothly,a common node separate model which is considering the mechanical difference between steel and concrete during blasting was established based on the ANSYS/LS-DYNA platform,then the blasting program before demolition blasting was simulated.The simulation results show that the program which shallow hole blasting and deep hole blasting in combination is entirely feasible,thus this program for blasting construction is used.Through the comparative analysis with the actual blasting process,the numerical simulation technique can verify and optimize the blasting program.It can effectively guide the blasting construction,and it has important theoretical significance and practical value.
出处 《金属矿山》 CAS 北大核心 2012年第7期50-52,55,共4页 Metal Mine
关键词 拆除爆破 钢筋混凝土拱桥 数值模拟 分离式共节点模型 Demolition blasting Reinforced concrete arched bridge Numerical simulation Common node separate model
  • 相关文献

参考文献5

二级参考文献21

共引文献43

同被引文献38

引证文献5

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部