期刊文献+

小湾水电站放空底孔事故链轮闸门动水闭门试验 被引量:6

Hydrodynamic Closing Test of Emergency Caterpillar Gate in Emptying Bottom Outlet of Xiaowan Hydropower Station
下载PDF
导出
摘要 高水头动水闭门试验由于水力学复杂、不定因素较多、甚至可能引起次生灾害,一直行业内较忌惮的工作。小湾水电站放空底孔事故链轮闸门经过模型试验研究及参建各方的努力,成功完成了设计水头下的动水闭门试验,对该闸门的模型试验、原型试验情况进行了详细介绍及分析,并就两者进行了对比,为今后同类型高水头闸门的设计提供借鉴。 The hydrodynamic closing test of gate under high water head is always a problem in hydropower industry because of complex hydraulics, many uncertainties and possible secondary disasters. The actual hydrodynamic closing test of emergency caterpillar gate in emptying bottom outlet of Xiaowan Hydropower Station under designed operation head is successfully completed after model experimental tests. The results of model test and prototype test are analyzed and compared herein. The results will provide references for the design of gates with same type and higher operating head.
出处 《水力发电》 北大核心 2012年第8期93-96,共4页 Water Power
关键词 高水头 事故链轮闸门 模型试验 原型试验 小湾水电站 high water head emergency caterpillar gate model test prototype test Xiaowan Hydropower Station
  • 相关文献

同被引文献36

引证文献6

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部