期刊文献+

一种基于UML用例模型的软件可靠性分配方法 被引量:1

Method of Software Reliability Allocation Based on UML Use Case Model
下载PDF
导出
摘要 基于统一建模语言(UML)用例模型描述软件系统需求方面的特点;提出了以UML用例图中所包含的各个用例的使用频率作为衡量该用例的重要程度的依据,从而确定每个用例的重要度的权重因子。根据每个用例的权重因子来确定每个用例该承担的可靠性指标任务,实现软件可靠性指标在各个用例之间进行合理的分配。这种分配方案对保证软件系统的可靠性目标具有重大的现实意义,为软件后续开发、测试、维护提供可以参考的依据。 We introduced a methodology that starts with the analysis of the UML use case diagram for software reliabilityallocation with the probability of executing each use cases.We will utilize the probability of executing each use cases to measure the importance of the use case,then to determine weight factor of each use case.According to the weight factor of each use case to determine the reliability index undertaken by each use case,system architect can reasonable assign reliability index of system to each use case.This methodology based on use case can ensure the target of software reliability and provide reference for follow-up development and software test.
出处 《计算机科学》 CSCD 北大核心 2012年第B06期461-463,共3页 Computer Science
基金 贵阳市科技局项目([2010]筑科Ⅰ合同字第1-61号)资助
关键词 UML 用例 可靠性 分配 UML; Use case; Reliability; Allocation
  • 相关文献

参考文献6

  • 1Eriksson H-E, Penker M. UML Toolkit[M]. Publishing House of Electronics Industry, 2004,10:150-230.
  • 2Singh H, Cortellessa V, Cukic B, et al. A bayesian approach to reliability prediction and assessment of component based systems[C]//Proc, of 12th International Symposium on Software Reliability Engineering(ISSRE'01). 2001.
  • 3Corteliessa V, Singh H, Cukie B. Early reliability assessment of UML based software models[C]//WOSP'02. Rome, Italy, July 2002 : 24-26.
  • 4Khalaj M, Makui A, Tavakkoli-Moghaddam R, et al. SYstematic Approach to Calculate Risk and Reliability in Uncertainty Condition[J]. Journal of Basic and Applied Scientific Research, 2012,2(1) :573-582.
  • 5Hu Weng-sheng, Deng Zhou-hui, Hong Yi. A Method of FTA Base on UML Use Case Diagram[C]//ICRMS' 2011. June 2011:12-15.
  • 6Fan Lin-bo, Ma Zhi-gang. Tendency Analysis of Software Reliability Engineering[C]//ICRMS'2011. June 2011:12-15.

同被引文献11

  • 1段隆振,王凤斌,甘晟科,黄水源.基于敏捷化统一过程需求建模的研究及实践[J].计算机科学,2006,33(10):256-259. 被引量:4
  • 2[美]柯恩.敏捷估计与规划[M].宋锐,译.北京:清华大学出版社,2007:95-200.
  • 3Cortellessa V. Harshinder Singh and Bojan Cukim Early reliabili- ty assessment of UML based software models[C]//WOSP '02. Rome, Italy,July 2002 : 24-26.
  • 4Singh H,Cortellessa V, Cukic B, et al. A Bayesian approach to reliability prediction and assessment of component based sys tems[C]//proc. Of 12th International Symposium on Software Reliability Engineering(ISSRE'01). 2001.
  • 5Johnstone C P, Lill A, Reina R D. Does habitat fragmentation cause stress in the agile anteehinus? A haematological approach [J]. Journal of Comparative Physiology B: Biochemical, System- it,and Environmental Physiology,2011,182(1) : 139-155.
  • 6Mikulenas G, Kapoeius K. An Approach for Prioritizing Agile Practices for Adaptation [M]. Information Systems Develop- ment, 2011, Part 7 : 485-498.
  • 7Limpens F, Team R, EPFL, et al. Towards agile competence de- velopment[C]//2011 IEEE International Conference on Date of Conference. March 2012 : 667-672.
  • 8Swaminathan B, Jain K. Implementing the Lean concepts of Continuous Improvement and Flow on an Agile Software Deve- lopment Project: An Industrial case Study [C]//AGILE India (AGILE INDIA). Feb. 2012:10-19.
  • 9Bustard, David. Beyond Mainstream Adoption: From Agile Soft- ware Development to Agile Organizational Change[C]//Engi- neering of Computer Based Systems ([CBS), 2012 IEEE 19th International Conference. April 2012 : 90-97.
  • 10江瑜.基于UML的敏捷建模方法研究[J].计算机工程与设计,2008,29(15):4106-4108. 被引量:4

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部