摘要 分析了矿井顶板水害及防治现状 ,以兴隆庄煤矿 4 31 8工作面为例 ,用信息拟合方法对顶板富水性进行分区 ,应用模糊评判预测方法进行了顶板水量预测计算 :涌水量等级为 3级 ,正常涌水量为 0 .5~ 1 .5m3/ min,最大涌水量为 2 .2 5m3/ min,与实际涌水量一致。 In this paper,the actuality of water disaster and its control are analyzed.It is introduced that the dim judgement method of forecasting water yield,which is finished on the basis of water content division of roof aquifer by using the method of drawing up with the information.To take 4318 working face in Xinlongzhang coal mine as a example,the water yield from top water bearing body is forecasted;the water yield is divided 3 grages.Normal water yield is 0.5~1.5 m 3/min,maximum water yield is 2.25 m 3/min,that coincides with measured water yield.
出处 《煤田地质与勘探》 CAS CSCD 北大核心 2000年第4期53-56,共4页 Coal Geology & Exploration
关键词 顶板水 富水性 涌水量 模糊评判 兴隆庄煤矿 water inflow from top water bearing body watery withdrawal dim judgement Xinlongzhuang coal mine
  • 相关文献

参考文献1

  • 1张跃等,模糊数学方法及其应用,1991年

同被引文献74

引证文献10

二级引证文献76

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部