期刊文献+

悬臂拼装多跨连续梁桥计算参数的选取研究

Selective research on calculation parameter of cantilever assembling multi-span continuous girder bridge
下载PDF
导出
摘要 以孙口黄河公路大桥为研究对象,通过对主桥上部构造进行分析,对多跨连续梁桥的混凝土收缩徐变、非线性温度变化等计算参数的选取进行了研究,以确保连续梁桥设计满足规范要求。 Taking Sunkou Yellow River highway bridge as the research target, through analyzing the upper main bridge structure, the paper studies the calculation parameter selection of concrete creep shrinkage and nonlinear temperature alteration of multi-span continuous girder bridge, with a view to ensure the design of continuous girder bridge meets the norm demand.
作者 张磊
机构地区 北京工业大学
出处 《山西建筑》 2012年第23期173-174,共2页 Shanxi Architecture
关键词 连续梁桥 悬臂拼装 混凝土徐变 计算参数 continuous girder bridge, cantilever assembling, concrete creep, calculation parameter
  • 引文网络
  • 相关文献

参考文献10

  • 1BS5400 Part4 Code practice for Design of Concrete Bridges[Z].British Standard Institute,1984.
  • 2CEB-FIP.Model Code for Concrete Structures[S].
  • 3CEB-FIP.International Recommendations for the Design and Con-struction of concrete structure[S].
  • 4Bazant Z P,panula L S.Creep and Shrinkage Prediction Modelfor Analysis and Design of Concrete Structure Model B3[J].Materials and Structures,1995(28):357-365.
  • 5Gerwick Jr B C.Construction of prestressed concrete structure.New York:Wiley Interscience,1971:145-149.
  • 6Lin,T.Y,Burns,N.H.Design of Prestresed Concrete Structures,Third Edition,John Wilev and New Yoek,1981.
  • 7Robert D.Cook.有限元分析的概念和应用[M].程耿东,何穷,张国荣,译.北京:科学出版社,1989.
  • 8F莱哈特.钢筋混凝土及预应力混凝土桥建筑原理[M].项海帆,陈忠延,译.北京:人民交通出版社,1998.
  • 9林同炎,Ned H.预应力混凝土结构设计[M].第3版.北京:中国铁道出版社,1983.
  • 10马振林.日本预应力混凝土铁路桥的现状与发展方向[J].中国铁路,2001(7):57-59. 被引量:1

共引文献1

;
使用帮助 返回顶部