摘要
简要介绍了外雄水电站变形监测点的布置情况,对施工阶段采用的水平位移、垂直位移的观测方法作了具体阐述,并对观测资料进行整理,对观测数据进行精度分析等,对今后同类工程施工测量具有一定指导意义。
The paper introduces the deformation monitoring point distribution condition of Waixiong hydropower station, specifically describes the horizontal and vertical displacement detection methods at construction stage, collects the detection data, and accurately analyzes the detection data, which has certain guiding meaning for similar engineering construction measurement in future.
出处
《山西建筑》
2012年第23期251-253,共3页
Shanxi Architecture
关键词
水平位移
垂直位移
监测方法
精度分析
horizontal displacement, vertical displacement, monitoring method, aeeuraey analysis