期刊文献+

核电站蒸汽发生器传热管涡流检验数据库的设计与实现

The Database Design and Implement of Eddy Current Inspection for Nuclear Power Plant Steam Generator Tubes
下载PDF
导出
摘要 为建立适合国内核电机组的蒸汽发生器传热管涡流检验数据库,以ORACLE平台为基础,讨论了数据库的设计与实现。主要介绍了建立涡流检验数据库的必要性及数据库设计与实现的思路,并以现有的数据为对象列举了几个有代表性的应用实例。结果表明,利用数据库设计的"第一范式"的规则可以建立一个组织完善的涡流检验数据库结构,数据的插入、更新、删除及查询可通过SQLPlus工具或用编程语言设计的客户端实现。 In order to offer guidelines for establishing the eddy current inspection database applicable for the situation of domestic nuclear power units, this paper discussed the database design and implement of eddy current inspection for nuclear power plant steam generator tubes based on ORACLE. Mainly this paper introduced the necessity of establishing the database of eddy current inspection, the approach of database design and implement, and several typical application examples. The thorough structure of eddy current inspection database could be established by utilizing the "The First Normal Form" of database design principles, and the data insertion, updating, deletion and query could be done using SQL Plus tool or client interface written by programming language
出处 《无损检测》 2012年第7期49-52,66,共5页 Nondestructive Testing
关键词 传热管 涡流检验 数据库 设计与实现 Steam generator(SG) tubes Eddy current inspection Database Design and implement
  • 相关文献

参考文献7

二级参考文献12

  • 1姜玥,谢青,谈文蓉,马丽.油气藏开发管理GIS中空间数据库的设计及应用[J].西南民族大学学报(自然科学版),2004,30(4):538-540. 被引量:3
  • 2吴东胜,焦宗福.基于GIS的油气勘探成果信息系统[J].江汉石油学院学报,2004,26(4):45-46. 被引量:7
  • 3王学杰,高德政,杨德生.县级矿产资源规划管理信息系统的数据库设计[J].电脑知识与技术(技术论坛),2005(5):64-66. 被引量:3
  • 4魏莲,吴信才,刘修国.基于GIS的石油勘探信息系统[J].测绘科学,2007,32(3):130-131. 被引量:10
  • 5Obrutsky L, Renaud J, Lakhan R. Steam Generator Inspections[C]// Faster, Cheaper And Better, Are We There Yet. Buenos Aires: Ⅳ Conferencia Panamericana de END, 2007.
  • 6Guerra J.New Eddy Current Steam Generator Tube Inspection System[A].5th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components[C].San Diego,2006.
  • 7Westinghouse Nuclear Services.Automated Eddy Current Acquisition System[EB/OL].http://www.westinghousenuclear.com/Products_&_ Services/docs/flysheets/NS-FS-0002.pdf,2007-08-15.
  • 8Oliver J C.25 Years...The Maturing of a Process[A].5th Annual EPRI Steam Generator Workshop[C].Marco Island,Florida,USA,2006.
  • 9Saito T,Asada Y,Takatsugu M,et al.SG Tube Inspection Experience with Intelligent ECT Probe[A].5th International Conference on NDE in Relation to Structural Integrity for Nuclear and Pressurized Components[C].San Diego,2006.
  • 10Kawata K,Kurokawa M,Kawase N,et al.Intelligent ECT System[J].Inspection Technology,2005,6,10-6,66-72.

共引文献15

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部