摘要
桥梁结构健康监测系统实施环节众多而且周期长,为了提高系统实施的效率和质量,有必要进行工厂化实施。本文以曹妃甸1#桥系统为例对工厂化实施进行了积极的探索。
Because implementation of bridge structural heaith monitoring system have many links and a long cycle, in order to improve the efficiency and quality system implementation, it isnecessary to carry out the factory implementation. This article describes the Caofeidian 1#bridge system as an example on factory implementation of active exploration.
关键词
桥梁结构健康监测系统
工厂化实施
效率
质量
Key words:Bridge structural health monitoring system Factory implementation Effi-ciency Quality