期刊文献+

炼钢机器故障下炼钢-连铸调度DCSP建模与算法 被引量:4

Dynamic CSP-based modeling and algorithm of scheduling problem for steelmaking-continuous casting under steelmaking machine failures
下载PDF
导出
摘要 针对机器故障下的炼钢-连铸动态调度问题,基于动态约束满足技术开发了能够灵活反映各种动态因素的建模机制。从变量、值域和约束三个角度将生产过程中的机器故障的影响映射为约束满足模型的动态变化;提出了重调度前后调度方案在时间安排和机器指派上的一致性度量方法,以满足不同炉次对时间和机器一致性的不同要求;将机器故障扰动按影响程度分为3个层级,建立了故障扰动与约束满足调度模型间的映射关系。根据炼钢、精炼阶段的机器故障扰动程度,制定不同的求解策略,并为机器指派变量赋值;基于约束传播技术,通过调整开工时间和柔性加工时间分步消解时间约束冲突。仿真实验表明,提出的模型和算法是可行和有效的。 An efficient modeling mechanism for the dynamic scheduling problem of steelmaking-continuous cast- ing production under the machine failures is established based on the Dynamic Constraint Satisfaction Problem (DCSP). The modeling mechanism describes variable factors of production easily and accurately. The impact on scheduling by machine failures is mapped to the dynamic changes of DCSP model in variables, domains and con- straints. Consistency measurement of the schedules before and after rescheduling is presented, to meet the require- ment of different charge for time variables and machine variables assignment. Disturbances from machine break- down are divided into 3 levels according to their impact on scheduling strategy, and then the mapping relationship between the disturbances of machine breakdown and DCSP model of scheduling is built. Different solving strategies ii are established according to the degree of the machine failure, and the machine variables are reassigned for the oper- ations in steelmaking. Based on the constraint propagation, and through adjusting the starting and processing time, the conflicts on time variables are cleared in the algorithm. The validity of the model and the algorithm is testified by the simulation experiments.
出处 《计算机工程与应用》 CSCD 2012年第22期226-234,共9页 Computer Engineering and Applications
基金 国家自然科学基金资助(No.70771008) 中央高校基本科研业务费专项资金资助(No.FRF-AS-09-007B)
关键词 炼钢-连铸 动态调度 动态约束满足 机器故障 steelmaking-continuous casting dynamic scheduling dynamic constraint satisfaction machine failures
  • 相关文献

参考文献12

二级参考文献61

  • 1苏冬平,陈文明,罗首章,陈军鹏,周仁义,郝冠华,郑秉霖.人机交互调整炼钢连铸调度计划[J].冶金自动化,2005,29(3):17-20. 被引量:11
  • 2陈文明,苏冬平,俞胜平,郑秉霖.炼钢连铸调度计划模糊评价方法的研究[J].冶金自动化,2006,30(1):6-11. 被引量:3
  • 3李铁克,周健,孙林.连铸连轧和冷装热轧并存环境下的炼钢-连铸生产调度模型与算法[J].系统工程理论与实践,2006,26(6):117-123. 被引量:18
  • 4唐立新,杨自厚,王梦光,东北大学自动控制系.炼钢─连铸生产的计划与调度结构[J].东北大学学报(自然科学版),1996,17(6):664-667. 被引量:21
  • 5Tang,L. X. , Liu, J. Y. , Rong,A. Y. , et al. A mathematical programming model for scheduling steelmakingcontinuous casting production[J]. European Journal of Operational Research, 2000, 120(2): 423-435.
  • 6Tang, I.. X. , Luh, P. B. , I.iu, J. Y. , et al. Steelmaking process scheduling using lagrangian relaxation [J]. International Journal of Production Research,2002, 40(1): 55-70.
  • 7Xuan, H. , Tang, L. X.. Scheduling a hybrid flowshop with batch production at the last stage[J]. Computers and Operations Research, 2007, 34(9): 2718-2733.
  • 8Bellabdaoui, A. , Teghem, J.. A mixed-integer linear programming model for the continuous casting planning [J]. International Journal of Production Economics,2006, 104(2): 260- 270.
  • 9Missbauer, H. , Hauber, W. , Stadler, W.. A scheduling system for the steelmaking continuous process: A case study from the steel-making industry[J]. International Journal of Production Research, 2008, First, 1- 26.
  • 10Benders, J. F.. Partitioning procedures for solving mixed variables programming problems [J]. Numerische Mathematik, 1962, 4(3): 238-252.

共引文献78

同被引文献107

引证文献4

二级引证文献33

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部