益地水电站消能防冲工程设计研究

Design on Energy Dissipation and Erosion Control for Yidi Hydropower Station
下载PDF
导出
摘要 介绍了益地水电站工程概况、水库运行方式,对闸坝闸后消能工进行了水力学计算、水工模型试验验证及方案比选。结果表明:采用下挖式消力池、防掏措施、四面体海漫及下游岸坡防护措施,能确保益地水电站首部闸坝运行安全。 The project basic situation 'and reservoir operation mode of Yidi Hydropower Station are introduced. The dissi- pater behind sluice gate is calculated in hydraulic method and hydraulic model tests are carried out on dissipater in order to be compared and chosen. The results show that employing stilling basin dug, anti-cutting measure, tetrahedral apron and downstream bank slope protection measures can ensure the safe operation of the first sluice -and dam of Yidi Hydro- power Station.
作者 王华
出处 《水电与新能源》 2012年第4期22-25,共4页 Hydropower and New Energy
关键词 消力池 海漫 水力学 水工模型试验 stilling basin apron hydraulics hydraulic model test
  • 相关文献

参考文献3

  • 1SL265-2001.水闸设计规范[S].[S].,..
  • 2李炜.水力计算手册[M].北京:中国水利水电出版社,2006.
  • 3吴持恭.水力学[M].北京:高等教育出版社,1998..

共引文献378

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部