摘要
介绍了原高坝洲水电厂油压装置控制系统存在的问题,提出了高坝洲水电厂油压装置控制系统的改造要求,叙述了改造后的油压装置控制系统的特点及运行情况。
The original problems of the oil - pressure device control system of Gaobazhou Hydropower Station are dis- cussed. Requirements for the reconstruction are proposed. The characteristics and operation performance of the upgraded oil -pressure device control system are also described.
出处
《水电与新能源》
2012年第4期26-28,共3页
Hydropower and New Energy
关键词
高坝洲水电厂
油压装置
控制系统
改造
软启动器
Gaobazhou Hydropower Plant
oil-pressure device
control system
reconstruction
soft starter