期刊文献+

Bending behavior of double-row stabilizing piles with constructional time delay 被引量:11

Bending behavior of double-row stabilizing piles with constructional time delay
原文传递
导出
摘要 The bending behavior of double-row stabilizing plies is associated with the constructional time delay(CTD),which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile.This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed.The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation.A triangular distributed earth pressure is assumed on the pile segment in the sliding layer.The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints.The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project,Taizhou,Zhejiang,China.It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles.An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile,which is 1.4 months for the Hongyan landslide project. The bending behavior of double-row stabilizing plies is associated with the constructional time delay (CTD), which can be defined as the time interval between the installations of the front stabilizing pile and the rear stabilizing pile. This paper investigates the effect of CTD on the bending moments of double-row stabilizing piles and a method for determining the optimal CTD is proposed. The stabilizing pile is modeled as a cantilever pile embedded in the Winkler elastic foundation. A triangular distributed earth pressure is assumed on the pile segment in the sliding layer. The front stabilizing pile and the rear stabilizing pile are connected by a beam with pinned joints. The analytical solutions of bending moments on the front and the rear stabilizing piles are derived and the accuracy of bending moment solutions is validated by comparing the tensile strain measured from the Hongyan landslide project, Taizhou, Zhejiang, China. It is concluded that CTD has a significant influence on the bending moments of double-row stabilizing piles. An optimal CTD can be obtained when the maximum tensile stress in the front stabilizing pile is equal to that in the rear stabilizing pile, which is 1.4 months for the Hongyan landslide project.
出处 《Journal of Zhejiang University-Science A(Applied Physics & Engineering)》 SCIE EI CAS CSCD 2012年第8期596-609,共14页 浙江大学学报(英文版)A辑(应用物理与工程)
基金 Project supported by the National Natural Science Foundation of China (No. 40972187) the Key Innovation Team Support Project of Zhejiang Province (No. 2009R50050)
关键词 Subgrade reaction LANDSLIDE Stabilizing pile Constructional time delay (CTD) Bending moment 路基反应;山崩;稳定堆积;构造上的时间延期(CTD ) ;弯曲时刻
  • 相关文献

参考文献30

  • 1Ashour, M., Pilling, P., Norris, G., 2004. Lateral behavior of pile groups in layered soils. Journal of Geotechnical and Geoenvironmental Engineering, 130(6):580-592. [doi: 10. 1061/(ASCE)1090-0241(2004 )130:6(580)].
  • 2Bransby, M.F., Springman, S.M., 1996. 3-D finite element modelling of pile groups adjacent to surcharge loads. Computers and Geotechnics, 19(4):301-324. [doi:10. 1016/0266-352X(95)00001-Q].
  • 3Bransby, M.F., Springman, S.M., 1999. Selection of load- transfer functions for passive lateral loading of pile groups. Computers and Geotechnics, 24(3):155-184. [doi: 10.1016150266-352X(99)00006-3].
  • 4Cai, F., Ugai, K., 2011. A subgrade reaction solution for piles to stabilise landslides. Geotechnique, 61(2):143-151. [doi: 10.1680/90ot. 9. P.026].
  • 5Chandrasekaran, S.S., Boominathan, A., Dodagoudar, G.R., 2010. Group interaction effects on laterally loaded piles in clay. Journal of Geotechnical and GeoenvironmentalEngineering, 136(4):573-582. [doi:10.1061/(ASCE)GT. 1943-5606.0000245].
  • 6Chen, L.T., Poulos, H.G., 1997. Piles subjected to lateral soil movements. Journal of Geotechnical and Geoenviron- mental Engineering, 123(9):802-811. [doi:10.1061/ (ASCE)1090-0241 (1997)123:9(802)].
  • 7Chen, L.T., Poulos, H.G., Hull, T.S., 1997. Model tests on pile groups subjected to lateral soil movement. Soils and Foundations, 37( 1): 1-12. [do i: 10.3208/sandf.37.1 ].
  • 8Clark, J., Richards, D.J., 2005. Measurement of Bending Moment in Concrete. Proceeding of the 16th International Conference Soil Mechanics and Geotechnical Engineer- ing, Osaka, 2:1027-1030.
  • 9de Sousa Coutinho, A.G.F., 2006. Data reduction of horizontal load full-scale tests on bored concrete piles and pile groups. Journal of Geotechnical and Geoenvironmental Engineering, 132(6):752-769. [doi:10.1061/(ASCE)1090- 0241 (2006)132:6(752)].
  • 10Esu, F., D'Elia, B., 1974. Interazione terreno-struttura in un palo sollectato dauna frana tipo colata. Rivsita ltaliana di Geotechica, 8(1):27-38 (in Italian).

同被引文献118

引证文献11

二级引证文献71