重庆市忠县三期Ⅰ类地灾防治工程设计变更分析

Analysis on Design Change of the Third Period Type I Disaster Prevention and Control Project at Zhongxian,Chongqing
下载PDF
导出
摘要 针对库区地灾防治项目设计变更现状,以重庆市忠县三期应急Ⅰ类地灾防治项目为例,对设计变更资料进行了整理和分析,归纳了6项设计变更主要内容,并总结了7种引起设计变更的原因。最终提出控制工程设计变更管理的措施及建议。以期将今后各类项目建设工程的设计变更工作做得更好。 This article aims at the design change situation of disaster prevention project in the Three gorges reservoir area, taking the third period type I disaster prevention emergency project in Zhongxian Chongqing as an example ,to have the change of the design data collection and analysis. It summarizes the of contents six main design changes, and sums up seven kinds of reasons causing the design change. The paper puts forward control engineering design change management measures and suggestions, hoping to make the design change work for aU kinds of construction project better.
出处 《地下空间与工程学报》 CSCD 北大核心 2012年第A01期1626-1630,共5页 Chinese Journal of Underground Space and Engineering
关键词 地灾防治 设计变更 disaster prevention and control design change
  • 相关文献

参考文献9

  • 1Robert K. Cox, Esq. Managing change orders and claims [ J]. Journal of Management in Engineer-ing, 1997.
  • 2陈宁,杨赞锋.变更工程对工程投资的影响[J].武汉交通科技大学学报,1998,22(2):166-168. 被引量:5
  • 3董春山,丁十昭.工程变更管理[D].上海:同济大学,1999.
  • 4丁本信.建设工程合同管理与案例分析[M].中国建筑工业出版社,2004.
  • 5方俊,舒立新.建设项目工程变更的分类与控制[J].广东技术师范学院学报,2004,25(4):84-88. 被引量:11
  • 6郑立新.FIDIC合同条件下的工程变更控制[J].国外建材科技,2007,28(4):159-161. 被引量:4
  • 7Hester W. T. and Kuprenas J. A.. Construetion Cha- nge and Change orders: their magnitude and impact [ R ]. Construction Industry Institute, source Document66, Austin, Tex, 1991.
  • 8Zeitoun A A. Early warning signs of project changes [ R]. Construction Industry Institute, Source Document, CII, Austin, Tex, 1 992.24.
  • 9C. William Ibbs. Quantitative Impacts of Project Change Size Issues[ J]. Journal of Construction Engineering and Management, ASCE, 1997, (9).

二级参考文献16

共引文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部