期刊文献+

广西某铀矿山露天采场及废石场的退役治理 被引量:2

Close-out of open pit and waste rock piles of a uranium mine in Guangxi province of China
下载PDF
导出
摘要 广西某铀矿山露天采场及废石场退役治理的项目包括露天采场,东、西部废石场,转运站,工业场地,建(构)筑物,运矿公路,以及设备器材等。介绍露天采场、废石堆环境贯穿辐射剂量率,222 Rn析出率,土壤中226 Ra比活度,以及个人剂量等的治理限值,详细论述了治理目标和各项目的治理方案。对治理后的效果作了评价。 Close-out of projects of a mine in Guangxi province of China includes open pit, east and west waste rock piles, ore transfer station, industrial fields, buildings, ore transporting road, and equipment and conduits. The following remediation limits are introduced: environment penetrating radiation dose rate and 222 Rn flux of open pit and waste rock piles, 226 Ra specific activity of soil and individual dose. Remediation objective and programme are discussed in details. Remediation effects are evaluated.
出处 《铀矿冶》 CAS 2012年第3期158-161,共4页 Uranium Mining and Metallurgy
关键词 露天采场 废石场 退役 uranium open pit waste pile remediation
  • 相关文献

参考文献4

  • 1GB18871-2002电离辐射防护与辐射源安全基本标准[S].北京:中国标准出版社,2003:37.
  • 2GB14586-1993铀矿冶设施退役环境管理技术规定[S].北京:中国标准出版社,1993.
  • 3United States Nuclear Regulatory Commission. 46FR5206-3 branch technical position on the dispo- sal of residual thorium or uranium[S]. Washington, DC: NRC, 1981.
  • 4GB3838-2002地表水环境质量标准[S].北京:中国标准出版社,2002.

共引文献49

同被引文献4

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部