摘要 随着施工技术的迅速发展与新材料的诞生,现有施工预算定额无法完全满足施工图预算要求,因此需要编制补充定额或采用定额代用方式完成施工预算,满足项目费用控制要求。本文阐述了补充定额编制及定额子目代用的详细方法,并列举了近年工业项目常用的补充定额的基价编制数据,为项目费用控制或其它工程造价提供参考。 With the rapid development of construction technique and the emerging of new materials, the existing quota of construction budget can not meet the requirement of construction drawing budget completely. Therefore, it is necessary to compile supplementary quota or use substitute quota to accomplish the construction budget to meet the demand of project cost control. The detail method of compiling supplementary quota and substitute quota subtitle are expounded. The base price data of supplementary quota which generally used in recent years are provided. Those data can provide reference for project cost control and other construction cost.
作者 王自忠
出处 《中国矿山工程》 2012年第4期44-46,共3页 China Mine Engineering
关键词 定额 项目 预算 quota project budget
  • 相关文献

同被引文献13

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部