4Anthony.Stentz, John.Bares. A Robotic Excavator for Autonomous Truck'Loading[M]. Autonomous Robots, 1999: 175-186.
5David A.Bradley, Derek W.Seward. The Development Control and Operation of an Autonomous Robotic Excavator[J]. Journal of Intelligent and Robotic Systems, 1998(21): 73-07.
6CAD-Integrated Real-Time Control for Robotic Excavation and PipeLaying: Devclopent and Testing[J]. U. S. Department of Transportation. Federa H ghway Ad n nistration Aug.1997. Publication No.FHWA-RD-97-O04.
7SHI Xiao-bo.Fuzzy behavior integration and action fusion for roboicexcavation [J]. In IEEE transactions on industrial electronics,1996, 43(3):395-402.
8SHI Xiao-bo.lntelligent control of autonomous rock excavation£°theory & experimentation[D]. PhD Thesis Great Britain 1996.