摘要
为了满足较高功率发电机组的负载试验,通过将水电阻电极由三相空间对称的常规排列方式改进为三相交错排列方式,能减小水电阻值,增加其28.5倍的负载功率,满足更高功率发电机组的负载试验。
In order to meet the higher power generator load test, the water resistance electrodes are improved from the conventional phase space symmetry arrangement to the phase staggered arrangement, which can reduce water resistance, increase the load power 28.5 times, and meet the higher power generator load test.
出处
《船电技术》
2012年第B08期11-13,共3页
Marine Electric & Electronic Engineering
关键词
水电阻
三相交错排列
比拟法
water resistance
three-phase staggered pattern
analogy method