摘要
近年来,随着煤矿企业的纵深发展,矿井和选煤厂建设规模不断扩大,原煤和产品煤的运量也在急剧增加,为了满足运输要求,选煤厂装车场地及厂外公路的设计就急需解决,而温家庄选煤厂装车场地及厂外道路工程就是其中的一个实例。文章通过对场地选址、收集资料、功能布局、方案比较等进行论述,指出设计中容易出现的问题及注意事项,以期对类似工程设计有一定的借鉴作用。
In the recent years, with the deep development of the coal enterprises, the construction scale of the mine and coal preparation plant would be continuously expanded and the transportation value of the raw coal and the cleaned coal were also rapidly increased. In order to meet the transportation requirements, the coal loading yard of the coal preparation plant and the roadway outside the coal preparation plant would be provided. The truck loading yard and the roadway outside the Wenjiazhuang Coal Preparation Plant was a case. The paper stated the site location selection, information collection, distribution of the function and the plan comparison. The paper pointed out the problems easily occurred in the design and notes in order to have certain references to the similar project design.
出处
《煤炭工程》
北大核心
2012年第8期20-22,共3页
Coal Engineering
关键词
选煤厂
装车场地
厂外道路
设计合理
coal preparation plant
truck loading yard
roadway outside of plant
rational design