期刊文献+

高压计量整体误差现场校验技术研究与应用 被引量:6

Research on Integral Error Calibration Technology of High Voltage Power Metering Device and Its Application
下载PDF
导出
摘要 为解决现有高压电能计量装置的整体误差校验现场工作,提出了一种高压计量整体误差现场校验装置,将电压互感器、电流互感器、二次压降及低压电能表作为一个被测试的整体,通过装置输出的高压大电流模拟高压电能计量装置的实际运行工况,实现计量误差的现场校验。 To solve the field calibration of integral error ~or existing high voltage power metering device, this paper puts forward the field calibration device of high voltage metering integral error. The calibration device takes voltage transformers, current transformers, secondary voltage drop and low voltage power meter as a whole test object. The calibration device can output high voltage and high current to simulate actual operating conditions of high voltage power metering device. Therefore, it achieves the field calibration of measurement error.
出处 《水电能源科学》 北大核心 2012年第8期168-171,共4页 Water Resources and Power
关键词 高压电能计量 整体误差 现场校验 组合互感器 应用 high voltage electric power measurement integral error field calibration combined transformer application
  • 相关文献

参考文献9

  • 1全国电能计量柜联合设计研制组.电能计量柜(GB/T169341997)[S].北京:中国标准出版社,1998.
  • 2British Standards Institution(BSI). Testing Equipment for Electrical Energy Meters(BS IEC 60736-2001) [S]. London: BSI, 2001.
  • 3辽宁省计量科学研究院,河南省计量科学研究院,河南思达高科股份有限公司.交流电能表检定装置检定规程(JJG597-2005)[S].北京:中国计量出版社,2005.
  • 4瞿清昌.高压电能计量关键技术和量值溯源的研究[J].中国计量,2006(11):49-51. 被引量:7
  • 5国家高电压计量站,浙江省质量技术监督检测研究院,中国计量科学研究院,等.电力互感器检定规程(JJG1021-2007)[S].北京:中国计量出版社,2007.
  • 6河南省电力工业局,电能计量装置技术管理规程(DL448-2000)[S].北京:中国电力出版社,2000.
  • 7郭琳云,徐芝贵,张乐平,尹项根.高压电能计量装置整体误差校验台[J].电测与仪表,2010,47(1):18-21. 被引量:24
  • 8沈阳变压器研究所,传奇电气(沈阳)有限公司,武汉高压研究所,等.组合互感器(GBl7201-2007)[S].北京:中国标准出版社,2007.
  • 9电力工业部武汉高压研究所.电能计量柜基本试验方法(DL/T549-94)[S].北京:中国电力出版社,1994.

二级参考文献11

  • 1卜正良,尹项根,涂光瑜.高压电能表的研制[J].电力系统自动化,2006,30(19):89-93. 被引量:27
  • 2瞿清昌.高压电能计量关键技术和量值溯源的研究[J].中国计量,2006(11):49-51. 被引量:7
  • 3GB/T16934-1997,电能计量柜[S].
  • 4Linyun Guo,Xianggen Yin. Research on integral error calibrating system of high-voltage electric energy measurement device [C]. UPEC 2007 Conference, 4th-6th September 2007, Brighton, UK.
  • 5S.-P. Jin,B. Inhester,D. Innes. A 2D numerical study of explosive events in the solar atmosphere[J] 1996,Solar Physics(2):279~295
  • 6T. G. Forbes,J. M. Malherbe. A numerical simulation of magnetic reconnection and radiative cooling in line-tied current sheets[J] 1991,Solar Physics(2):361~391
  • 7T. G. Forbes,J. M. Malherbe,E. R. Priest. The formation of flare loops by magnetic reconnection and chromospheric ablation[J] 1989,Solar Physics(2):285~307
  • 8K. P. Dere,J. -D. F. Bartoe,G. E. Brueckner. Explosive events in the solar transition zone[J] 1989,Solar Physics(1):41~68
  • 9T. G. Forbes,E. R. Priest. A numerical experiment relevant to line-tied reconnection in two-ribbon flares[J] 1983,Solar Physics(1-2):169~188
  • 10胡顺,徐芝贵.高压电能表的研制进展[J].电测与仪表,2008,45(1):1-3. 被引量:23

共引文献26

同被引文献35

引证文献6

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部