“机敏”级潜艇设计和建造的经验教训 被引量:1

Lessons from design and building of the Astute submarine
下载PDF
导出
摘要 英国"机敏"级潜艇项目严重拖期,成本大幅上涨,使英国为此付出了巨大的代价。本文从项目管理的角度,剖析了"机敏"级潜艇在设计、建造、测试和交付等方面出现的问题及其原因,得出了"机敏"级潜艇在设计和建造中的经验和教训,对我国舰船装备研制管理顶层设计具有一定的参考价值。 UK Astute submarine program has been delayed a long time and has seen a sharp rise in cost,which is an important lesson in the history of submarine development for UK Royal Navy. In this paper, problems and reasons arisen in this program are discussed, by reviewing Astute submarine's design, building, test and delivery. At last, measures and findings for Astute submarine program management during designing and building process are summarized, which have reference effect for overarching design of our ship equipments program.
作者 宋晓东
机构地区 海军
出处 《舰船科学技术》 北大核心 2012年第8期137-140,共4页 Ship Science and Technology
关键词 潜艇 设计 建造 submarine design building
  • 相关文献

参考文献6

  • 1Lessons from the United Kingdom's Astute Submarine Program[ R ]. Rand National Defense Research Institute, 2011.
  • 2Lessons from the Submarine Programs of the United States [ R ]. United Kingdom, and Australia, Rand National Defense Research Institute,2011.
  • 3RICHARD S. Astute submarine programme hit by design delay[J]. Jane's Defense Weekly,2002-8-14.
  • 4MUIR M. How Team Made an Astute Move, Excellence in Defence Procurement [ R ]. Defence Procurement Agency, 2004.
  • 5BROWN D K, MOORE G. Rebuilding the Royal Navy [ M ]. Annapolis, Md. : Naval Institute Press ,2003.
  • 6Ministry of Defence, Director General, The Smart Acquisition Handbook, Edition 5 [ M ]. The United Kingdom, January 2004.

同被引文献7

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部