摘要
文中介绍了察尔森水库迎水坡破坏的情况,从冰冻、风浪和施工质量等方面对破坏原因进行了分析,并针对不同部位采取相应的措施进行加固,取得了很好的效果。
The paper introduces the breakages of Chaershen dam upstream slope, and analyzes the breakage causes from the aspects of frost, wave stroke and constructive deficiency.In view of the different breakage places, the dam slope was reinforced by corresponding measures, and the effect is well.
出处
《东北水利水电》
2000年第6期22-23,共2页
Water Resources & Hydropower of Northeast China