摘要
来实公司生产的FLEX-LOK400直立锁边屋面板、高强镀锌檩条以及2W结构楼承板配重等构成的屋面系统,在厦门会展中心三期工程大跨度(99 m、72 m)金属屋面上应用,抗风揭、抗腐蚀,且防水、保温、隔热;施工时,屋面板需现场压型,部件安装方向需背风向,细部节点的安装定位比较严格;各期工程完工后,屋面质量良好。
Lysaght roof system including FLEX-LOK 400 standing seam roof board, high strength galvanized purlin and 2W structural building bearing plate applies in large span (99 m, 72 m) metal roof of Xiamen Convention and Exhibition Center project, phase Ⅲ. The system is wind uplift resistant, corrosion resistant, waterproofing and insulating. The profiled roof boards are made on-site, the components installation should face leeward and the installation location of details is strictly required. Good quality is obtained after construction.
出处
《中国建筑防水》
2012年第15期7-11,共5页
China Building Waterproofing