摘要
从国际EPC工程特点出发,结合中国企业现状对汇率波动、工期、付款方式、成本组成及现金流五大因素进行详细剖析,形成外汇风险量化的科学方法,为中国承包企业在国际承包中实现精细化管理提供参考。
Based on EPC contract characters and Chinese contractor's situation, detailed analyzes the five factors such as exchange rate fluctuation, contract duration, measure of payment, cost component and cash flow, forming a formula of risk quantification, so as to provide reference in realizing diligent management for Chinese Contractor.
出处
《建筑经济》
北大核心
2012年第8期64-67,共4页
Construction Economy
关键词
EPC项目
外汇风险量化
进度计划
现金流
EPC contract
foreign exchange exposure
project progress plan
cash flow