可变工期施工项目的投标技巧 被引量:2

Bidding Method for Projects With Selective Construction Duration
下载PDF
导出
摘要 在传统的建筑工程招标中,业主一般规定工期,仅要求投标者就价格进行竞争。但为了进一步追求投资效益,近年来越来越多的业主要求承包商不仅报出价格还要报出工期,从而工期也成了竞争的因素。然而成本和工期是相互矛盾的,欲缩短工期,必须提高生产率,并消耗更多的资源,使得咸本上涨。承包商既要降低标价又要缩短工期,如何求得成本和工期的最佳值并求得二者的平衡,是施工企业面临的难题。本文通过建立成本-工期双优化数学模型来解决上述问题。 In traditional invitation to tender, tonderers are merely requircd to submit a bid price with a complete tirne specified by thc owner. In order to improve investment effectiveness a number of owners require the tenderers to submit both bid price and completion tane. As Chinese contractors get used to' calCulate the tender price based on standard norm issued by the authority conccmed- They didn't provide ready-made basis for estimating the additional cost caused by deduction of completion time. This paper tries to deve lop a practicable mathematical bid model for Chincsc contractors to calculate both bid price and matched comp1etion time.
机构地区 管理工程系 基础部
出处 《北京建筑工程学院学报》 2000年第2期1-8,共8页 Journal of Beijing Institute of Civil Engineering and Architecture
关键词 可变工期项目 成本-时间曲线 投标 数学模型 project with selective completion time unit time value cost-time curve
  • 相关文献

参考文献1

同被引文献3

  • 1Jin-Fang Shr, M.ASCE1; Bin Ran, M.ASCE2; and Chiu Wei Sung3.(2004)"Method to Determine Minimum Contract Bid for A+B+I/D Highway Projects"JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT ASCE/JULY/AUGUST 509-516.
  • 2Jin-Fang Shr,ASCE1 M,Bin Ran,ASCE2 M and Chiu Wei Sung.Method to Determine Minimum Contract Bid for A+ B+ I/ D Highway Projects[J].Journal of Construction Engineering and Management & Asce.July/August,2004:509-516.
  • 3杨赞锋,李齐放.基于P-T参数的投标报价模型[J].科学学与科学技术管理,2003,24(9):27-29. 被引量:2

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部