期刊文献+

金山金矿尾砂水力充填技术应用研究 被引量:4

Research on hydraulic backfilling with large scale mining tailings
下载PDF
导出
摘要 针对金山金矿底盘漏斗中深孔落矿嗣后充填采矿法回采所形成的采空区特点,采用分级尾砂水力充填技术进行空区处理进而控制地压活动;结合采场充填挡墙受力分析,在采空区充填过程中采用了全断面脱水管脱水技术,使得采场充填工作顺利实施,并取得了显著效果。 According to the characteristics of the goafs formed due to the application of the mining method of medium-long hole blasting and backfilling with bottom funnels in Jinshan gold mine, the goaf treatment by classified tailings hydraulic filling is applied to control ground pressure activities. Based on the stress analysis of the back filling retaining walls, a dehydration technique using whole section dehydration tubes is adopted in the back filling process, which ensures a smooth workflow and satisfactory results in the process.
出处 《黄金》 CAS 2012年第8期22-24,共3页 Gold
关键词 中深孔落矿 采空区 水力充填 充填挡墙 脱水技术 medium-long hole blasting goaf hydraulic filling back filling retaining wall dehydration technique
  • 相关文献

参考文献4

二级参考文献9

共引文献50

同被引文献27

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部