工程建设物资管理存在问题及对策——以中国石化为例

On the existing problems and countermeasures of construction materials management
下载PDF
导出
摘要 物资管理包括物资从计划开始到进场及应用等全过程。为保证所有进入工程项目的物资都是合格品,保证工程施工质量,项目必须及时准确地做好工程物资供应的计划、采购、订货、运输、检验、保管和发放工作。文章从甲方单位的角度,分析甲供物资在石油工程建设领域的一些问题及对策。 Material management, includes the whole process of from the beginning cation. In order to guarantee all the materials entered in the Engineering project of the plan to entering and appli-are qualified and the construction quality is ensured, the project must prepare in time the plan of the supplication of the engineering materials, their purchase, booking, transportation, testing, safekeeping and distribution. From the perspective of Party A, this paper analyzed some problems and countermeasures of Party A in petroleum engineering construction field.
作者 黄昕
出处 《河南科技学院学报(社会科学版)》 2012年第7期26-28,共3页 Journal of Henan Institute of Science and Technology
关键词 工程建设 物资管理 采购 :engineering construction material management purchase
  • 相关文献

参考文献5

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部