摘要
通过总结采煤机滚筒过构造时所面临的问题,分析滚筒容易损坏的原因,针对过构造地质的特殊要求对滚筒进行优化设计,为采煤机过地质构造提供了可行的技术途径。
This paper has summarized problem when shearer roller passing through geologic structure faced, and analysed reason which easily caused roller damage. The Optimal designing for roller fit special requirements of geologic structure, which provided a viable technical approach to shearer passing through geologic structures.
出处
《煤矿机械》
北大核心
2012年第9期162-164,共3页
Coal Mine Machinery
基金
"十一五"国家科技支撑计划资助项目(2008BAB36B02)
关键词
采煤机
滚筒
地质构造
shearer
sheraer drum
geologic structure