摘要 西气东输二线沙河穿越工程是国内首次在汛期以大开挖形式穿越国家一级饮用水源保护地的大口径高钢级(D 1 219 mm、X80钢)双线管道。通过因地制宜,创新采用连续深基坑、止水帷幕等一系列大开挖穿越施工工艺,有效解决了汛期强渗水大型河流开挖穿越的施工难题,从整体上提高了国内管道施工企业应对大型河流开挖穿越施工的能力,为今后类似工程施工提供了范例。 The Shahe River crossing construction in the Second West-East Gas Pipeline Project is the first pipeline crossing project carried out in flood period to cross the national first class drink water sources protection area using large excavation method,and the crossing project has a large pipe diameter(D 1 219 mm),the high grade pipe steel X80 and dual pipelines.China Petroleum Pipeline No.2 Construction Company adopts the methods of continuous deep pits,waterproof curtains,etc.during local flood period,which are proved to be a good and effective solution to the construction.Generally speaking,it improves the domestic pipeline companies' ability of excavation crossing technology for large river crossing construction and sets a good example for such kind of projects.
出处 《石油工程建设》 2012年第4期36-38,9,共3页 Petroleum Engineering Construction
关键词 强渗水 大型河流 深基坑 帷幕止水 开挖穿越 intensive seepage large river deep pit waterproof curtain excavation crossing
  • 相关文献

参考文献1

二级参考文献3

  • 1SY/T4079-1995,石油天然气管道穿越工程施工及验收规范[S].
  • 2SL257-2000.水道测量规范[S].[S].,..
  • 3SY/T0055-2003.长距离输油输气管道测量规范[S].[S].,..

共引文献2

同被引文献42

引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部