项目缓冲设置方法及其评价指标改进 被引量:37

An improved approach for project buffer sizing and evaluation
原文传递
导出
摘要 论文提出了项目不确定条件下的缓冲区设置方法.该方法综合考虑资源紧张度、网络计划复杂度和项目经理风险偏好等影响因素,解决了资源紧张度难以量化和统一的问题,同时考虑用资源的可替代性解决资源紧张问题.通过模拟实验,将新方法与传统C&PM以及RSEM方法对不同可替代方案进行了比较,为选择最优方案提供参考.分析时不仅采用了传统评价指标,还引入了成本指标以衡量工期与成本是否均衡优化的问题.实验结果表明本文所提的新方法兼具有效性和实用性. The authors have put forward an improved approach for project buffer sizing based on the resource constrains, logical complexity as well as project managers' risk preference by using fuzzy logic theory. Taking resource substitutability into consideration, the authors have integrated the optimization and tradeoff between cost and schedule into the indicators for the evaluation of critical chain scheduling. By means of experimental study, the new approach has been verified to be more effective and efficient than the traditional C&=PM and RSEM approach.
出处 《系统工程理论与实践》 EI CSSCI CSCD 北大核心 2012年第8期1739-1746,共8页 Systems Engineering-Theory & Practice
基金 国家自然科学基金(70972072) 上海市重点学科资助项目(B310)
关键词 关键链 缓冲设置 可替代性 成本指标 critical chain buffer sizing resource substitutability cost indicator
  • 相关文献

参考文献11

  • 1Rand G K. Critical chain: The theory of constraints applied to project management[J]. International Journal of Project Management, 2000, 18(3): 173- 177.
  • 2Goldratt E M. Critical Chain[M]. Great Barrington, Mass, USA: The North River Press Publishing Corporation, 1997.
  • 3Steyn H. An investigation into the flmdamentals of critical chain project scheduling[J]. International Journal of Project Management, 2000, 19:363- 369.
  • 4褚春超.缓冲估计与关键链项目管理[J].计算机集成制造系统,2008,14(5):1029-1035. 被引量:88
  • 5Herroelen W S, Leus R. On the merits and pitfalls of critical chain scheduling[J]. Journal of Operations Man- agement, 2001, 19(5): 559-577.
  • 6Newbold R C. Project Management in the Fast Lane: Applying the Theory of Constraints[M]. New York: St. Lucie Press, 1998.
  • 7Long L D, Ohsato A. Fuzzy critical chain method for project scheduling under resource constraints and uncer- tainty[J]. International Journal of Project Management, 2008, 26(6): 688- 698.
  • 8马国丰,尤建新.关键链项目群进度管理的定量分析[J].系统工程理论与实践,2007,27(9):54-60. 被引量:50
  • 9Oya I T, Walter O R, Sandra D E. An investigation of buffer sizing techniques in critical chain scheduling[J}. European Journal of Operational Research, 2006, 172(2): 401- 416.
  • 10Steyn H. Project management applications of the theory of the constraints beyond critical chain scheduling[J]. International Journal of Project Management, 2002, 20(1): 75 -78.

二级参考文献32

  • 1唐建波,关昕,马力.关键链技术研究与基于关键链的项目管理系统[J].计算机工程与设计,2004,25(11):2077-2080. 被引量:20
  • 2赵道致,廖华.对关键链法的几个认识误区[J].工业工程,2005,8(2):4-6. 被引量:24
  • 3潘开灵 尹柳营.用制约因素理论指导企业技术进步[J].中国学术期刊文摘,1997,3(4).
  • 4Goldratt E M.What Is This Thing Called the Theory of Constraints?[M].NY:The North River Press,1990.
  • 5Goldratt E M,Cox J.The Goal[M].Aldershot.England:Gower,1993.
  • 6Goldratt E M.It's Not Luck[M].Aldershot.England:Gower,1994.
  • 7Goldratt E M.Critical Chain[M].NY:North River Press,1997.
  • 8Leach L P.Critical Chain Project Management[M].London:Artech House Inc,2000.
  • 9Steyn H.Project management application of the theory of constraints beyond critical chain scheduling[J].International Journal of Project Management,2002,20:75-80.
  • 10Patrick F S.Critical Chain and Risk Management-Protecting Project Value from Uncertainty[DB/OL].http://www.focusdperfor mance.com,2004-10-21.

共引文献138

同被引文献288

引证文献37

二级引证文献153

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部