期刊文献+

莲花电站四号机组水导油冷却器漏水处理中施工工艺的改进

Leakage treatment of oil cooler in unit No. 4 of Lianhua hydropower station
下载PDF
导出
摘要 2009年9月11日莲花四号机水导发电油面上涨约60mm,为水导冷却器漏水所致。在缺陷处理中,不破坏水导瓦间隙值,不用尾水蜗壳排水,采用在机坑内中心定位的方法,改进了工艺,提前了工期,提高了工效。同时,对冷却器铜管泄漏原因进行了分析。 On September 1 lth 2009, it was found that leakage of oil cooler of turbine guide bearing at unit No. 4 of Lian- hua hydropower station occurred. During treatment, to protect the clearance of turbine guide bearing segments and not to discharge by tailrace spiral case, central positioning in the turbine pit was adopted. In this way, technique improvement and higher efficiency were achieved. Further, the cause reasons of leakage were analyzed.
作者 柳树仁
出处 《大坝与安全》 2012年第2期54-55,共2页 Dam & Safety
关键词 莲花四号机 水导油混水 油冷却器泄漏 工艺改进 unit No.4 water infiltration into turbine guide bearing oil leakage of oil cooler technique improvement
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部