浅析地下管线施工过程各专业间的科学协调 被引量:1

Discussions on Unified Deployment of Underground Pipe Network Construction
下载PDF
导出
摘要 地下管线综合部署是火力发电厂总布置的重要组成部分之一.厂区地下管线综合布置应与总平面布置、管线之间竖向布置,以及交通运输与绿化设施统一考虑,使厂区内沟道与沟道之间、沟道与管线之间、沟道与道路之间、沟道与各建(构)筑物之间在平面及竖向上科学协调,紧凑合理,减少后期设计与前期设计的矛盾,使人力、物力、财力得到充分的利用,既有利于安全文明生产,又方便日后维护维修. Underground pipe network comprehensive deployment in thermal power plant is one of the important parts of the general layout. The underground comprehensive pipeline arrangement layout, vertical layout, traffic and trans- portation and green infrastructure are unified consideration. Made the trench with trench, channel and pipeline, trench and road, between channel and the building to build between the horizontal and vertical coordinate scientifi- cally in the plant area, and reduce contradiction of design and preliminary design. The manpower, material re- sourees, financial resources can be fully utilized and conducive to safe and civilized production, and convenient ma- intenance repair.
作者 栾卫中
出处 《吉林建筑工程学院学报》 CAS 2012年第4期41-44,共4页 Journal of Jilin Architectural and Civil Engineering
关键词 地下管线 统一部署 科学协调 underground pipeline trench unified deployment scientific coordination
  • 相关文献

参考文献2

共引文献1

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部