禹门口东扩工程预应力钢筒混凝土管道穿越汾河关键技术研究

Key Techniques of Placing PCCP of Yumenkou Eastern Extension Project to Pass Fen River
下载PDF
导出
摘要 禹门口提水东扩工程的管线在襄汾县穿越汾河,输水管道采用直径为2 m的预应力钢筒混凝土管道。管道穿越汾河施工十分困难。文中在明确其水文地质条件的基础上,从设计和施工的角度论述了穿越汾河的关键技术包括束窄河道、分期导流、开挖引河、围堰施工及基坑钻井排水等。 The pipe line of Yunmenkou Eastern Extension Project pass Fen River in Xiangfen County. The water diversion pipe is PCCP of 2m in diameter. Constructing this works is very difficult. On the basis of understanding hy-drogeologic condition in situ, and starting from design and construction angles, the paper expounds the key technique problems of passing Fen River including: narrowing river channel, stage construction diversion, excavating approach channel, construction of cofferdam and drilling drainage wells in foundation pit etc.
作者 王忠
出处 《山西水利科技》 2012年第3期20-21,47,共3页 Shanxi Hydrotechnics
关键词 分期导流 引河开挖 围堰施工 基坑降水 stage construction diversion excavation of approach channel construction of cofferdam water draw-down in foundation pit
  • 相关文献

参考文献1

  • 1武汉水利电力学院,成都科学技术大学.水利工程施工[M],北京:水利电力出版社,1983:49—53.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部