泽城西安水电站(二期)导流洞进出口段闸门及埋件防腐蚀施工及质量控制 被引量:1

Anti-corrosion Construction of Gates and Embedded Parts in Inlet and Outlet Section of Diversion Tunnel of Zecheng Xi'an Hydroelectric Power Station Project(Second Phase) and Construction Quality Control
下载PDF
导出
摘要 泽城西安水电站(二期)导流洞进出口段共设置了三套闸门,二套为平板钢闸门,孔口尺寸为4 m×8 m,一套为弧形闸门,孔口尺寸为7.0 m×6.5 m。文中叙述闸门及其埋件的防腐蚀施工及质量控制,具体内容包括:闸门金属表面的预处理、金属表面喷涂工艺和金属表面涂料涂装。 There are three gates in the inlet and outlet section of diversion tunnel of Zecheng Xi'an Hydroelectric Power Station Project (second phase).Two are plain steel gates , the opening sizes are 4 m×8 m .One is a radial gate , the opening sizes are 7.0 m×6.5 m .The paper expounds the anti-corrosion construction of gates and their embedded parts and construction quality control .The concrete contents include preliminary treatment on metal surface of gate , the gunting technique and japanning technique on gate surface.
作者 王兴旺
出处 《山西水利科技》 2012年第3期60-61,共2页 Shanxi Hydrotechnics
关键词 闸门 埋件 防腐蚀施工 质量控制 gate embedded parts anti-corrosion construction quality control
  • 相关文献

同被引文献5

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部