枕头坝一级水电站料源规划及砂石加工系统布置 被引量:2

Layout of aggregate processing system and material source planning for Zhentouba Hydropower Station Ⅰ
下载PDF
导出
摘要 枕头坝一级水电站工程开挖料源组成较为复杂,在设计砂石加工系统时需要对各种料源进行分析。侧重介绍了料源规划和砂石加工系统的设计方案。本着"节约投资、利于环保"的原则,充分利用主体工程开挖渣料,只用一套砂石料加工系统来生产不同混凝土品种的骨料。工程实践表明,该方案具有占地面积小、配备料仓少等优点,同时还能够有效节约人力和设备投入。 The composition of excavation material source of Zhentouba Hydropower Station I is complex, so the analysis on va- rious material sources is needed during the design of aggregate processing system. We present the design scheme of aggregate pro- cessing system and planning of material source. Based on the principle of saving the cost and favoring the environmental protec- tion, the material excavated from the principal part of the project is fully used and only one processing system is used to produce different kinds off concrete aggregates. The engineering practice shows that the scheme can be realized successfully and has the advantages of less land occupation and batch silo; meanwhile, the input of manpower sources and equipment can be saved.
出处 《人民长江》 北大核心 2012年第14期61-63,69,共4页 Yangtze River
关键词 料源规划 砂石加工系统 工程投资 环境保护 枕头坝一级电站 planning of material source aggregate processing system investment environmental protection Zhentouba Hy-dropower Station I
  • 相关文献

同被引文献5

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部