期刊文献+

库区深水路段路基设计与施工 被引量:1

Design and Construction on Subgrade of Deep-water Section in Reservoir Area
下载PDF
导出
摘要 库区深水路段的道路路基填筑受到水文、地形、地质、施工条件等因素的影响,是路基设计和施工中的一项难点,是整个道路工程成败的一个关键因素。通过库区深水路段路基填筑的设计实践,提出库区深水路段路基的设计和施工方法。道路建成通车以来的实践证明,深水库区路段路基整体稳定,效果较好。 Subgrade filling of deep-water section in reservoir area is affected by hydrological, topographical, geological and construction conditions, which is a problem in subgrade design and construction and also a key factor in overall road engineering. Through the practice in design of subgrade filling of deep-water section in reservoir area, the design and construction method thereof are proposed. It has proved that the overall stability of this subgrade is good since the road was opened to traffic.
作者 吴新锋
出处 《路基工程》 2012年第4期155-158,共4页 Subgrade Engineering
关键词 库区 深水路基 设计施工 reservoir area deep-water subgrade design and construction
  • 相关文献

参考文献5

  • 1贺春晖.三峡库区水位升降对沿岸建筑物的影响效应[J].路基工程,2009(3):94-95. 被引量:11
  • 2JTGB01-2003公路工程技术标准[S].北京:人民交通出版社,2004.
  • 3JTGD30-2004公路路基设计规范[S].北京:人民交通出版社,2004.
  • 4JTGF10-2006,公路路基施工技术规范[S].北京:人民交通出版社,2006.
  • 5交通部第二公路勘察设计院主编.公路设计手册一路基[K].北京:人民交通出版社,1996.

二级参考文献6

共引文献226

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部