摘要
通过新荣水库主坝坝体防渗加固工程的设计与施工的实践,提出充填灌浆在病险水库坝体防渗加固中具有较好的防渗效果,达到除险加固的目的。
through the Xinyong reservoir main dam reinforcement project design and construction practice,put forward fill grouting for reservoir dam seepage reinforcement has good anti-seepage effect,achieve the purpose of reinforcement.
出处
《大众科技》
2012年第8期63-64,共2页
Popular Science & Technology
关键词
主坝
充填灌浆
渗透系数
注浆试验
the main dam
filling grouting
seepage coefficient
grouting test