期刊文献+

人民胜利渠泥沙处理与资源利用途径 被引量:2

Treatment and Utilization of Sediment in the People's Victory Canal
下载PDF
导出
摘要 针对人民胜利渠运用以来灌区泥沙大量淤积,严重影响灌区生产效益与生态环境、制约灌区经济发展的现状,基于现有泥沙资源利用技术以及泥沙远距离输送技术,提出了人民胜利渠的泥沙处理措施与资源利用途径:首先,开展原沉沙池内泥沙资源利用,恢复渠首沉沙池生机,使其泥沙资源利用良性运转;其次,对于经沉沙池处理后的细泥沙,实施浑水灌溉入田改土;最后,建立泥沙处理与利用有机结合的运行机制,实现人民胜利渠粗细沙的合理沉积和利用,实现灌区可持续发展。 For the status of sediments deposited numerously in irrigation area since the People ' s Victory Canal used, production efficiency and eco- logical environment were seriously affected, and the economic development was restricted. Based on the sediment utilization and long-distance transportation, some ways of sediment treatment and utilization were put forward in the People's Victory Canal and as followings: firstly, to carry out sediment utilization in the original head settling basin which should be back to life so that the healthy mechanism of sediment utilization can work; secondly, to develop muddy water irrigation to change soil through fine sand after settling basin; thirdly, to establish the organic combined operation mechanism to achieve the reasonable deposition of sand and the sustainable development of irrigation area.
作者 姜秀芳 潘丽
出处 《人民黄河》 CAS 北大核心 2012年第8期39-40,共2页 Yellow River
关键词 资源利用 泥沙淤积 沉沙地 人民胜利渠 resource utilization sediment deposition sediment settling basin People ' s Victory Canal
  • 相关文献

参考文献5

二级参考文献23

共引文献43

同被引文献16

引证文献2

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部