期刊文献+

基于时间序列预测法的水利发展指标体系研究 被引量:1

Study on Water Conservancy Development Planning Index System Based on Time Series Prediction
下载PDF
导出
摘要 基于时间序列分析法,采用指数曲线、修正指数曲线、对数曲线和乘幂曲线分析方法进行组合比选,根据各项指标的特点,结合国家、省级及区域宏观调控的影响以及变化趋势等因素,对甘肃水利发展规划目标指标体系6大类26项指标进行了近期2015年和远期2025年的预测研究。结果表明:采用定量分析方法,可以预测甘肃省水利发展近、远期目标与任务动态区间,为甘肃省"十二五"水利发展规划提供重要参考。 Considering national and regional macroeconomic regulation and control and the change trend considered, water conservancy development plan target index system including 26 indicators in 6 major types for the recent year 2015 and the future year 2025 in Gansu was predicted based on time series analysis method, which involved comparison and selection from index curve, modified index curve, logarithmic curves and power curve analysis method. The results show that water conservancy development shori-term and long-term goals and tasks in dynamic interval in Gansu can be forecasted by using quantitative analysis method, which provides important reference to the Gansu Province water resources development planning of " the 12th Five-Year Plan".
出处 《人民黄河》 CAS 北大核心 2012年第8期74-76,共3页 Yellow River
基金 水利部公益性行业科研专项(201101046) 甘肃省创新团队建设项目(098TTCA006) 甘肃省水利发展"十二五"规划专题
关键词 时间序列法 指数曲线 对数曲线 乘幂曲线 水利发展 指标体系 甘肃省 time series method exponential curve logarithmic curve power curve water conservancy development indexes system Gansu Province
  • 相关文献

参考文献3

二级参考文献7

共引文献5

同被引文献9

引证文献1

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部