摘要
针对太钢焦化厂7.63 m焦炉基础的大体积混凝土浇筑、炉床板施工等重点及难点工序进行了介绍,分别阐述了施工工艺,操作要点,注意事项及质量控制措施,为今后同类工程积累了宝贵经验。
The paper introduces the construction points and difficulties of massive concrete grouting and furnace plate of 7.63 m coke oven foun- dation of Taigang coke plant, and respectively describes the construction technology, operation points, matters needing attention and quality con- trol measures, which has provided valuable experience for similar engineering in future.
出处
《山西建筑》
2012年第26期99-100,共2页
Shanxi Architecture
关键词
焦炉
基础
大体积混凝土
炉床板
coke oven, foundation, massive concrete, furnace plate