摘要
结合国际学校工程实际情况,详细介绍了现浇钢筋混凝土空心楼盖采用高分子组合芯模的施工工艺及相关技术要点,同时对其关键部位控制要点及检查验收作了简要说明,并针对施工中发现的问题提出了相应的处理措施,以指导今后同类工程。
Combining with the actual engineering situation of international school,this paper introduced in detail the construction technology and related technical key points of cast-in-situ concrete hollow floor using polymer combined core mold,and made briefly explanation for the control points and inspection of key parts,and put forward corresponding measures according to the problems found during the construction,in order to guide future similar engineering.
出处
《山西建筑》
2012年第25期123-124,共2页
Shanxi Architecture
关键词
高分子组合芯模
空心楼盖
施工工艺
控制要点
polymer combined core mold
hollow floor
construction technology
control key point