中线法尾矿坝地下渗流场的数值模拟 被引量:9

Numerical simulation on the seepage of tailings dam by centerline method construction
下载PDF
导出
摘要 利用2D-FLOW计算软件,针对羊拉铜矿中线法尾矿库在不同条件下的渗流进行了模拟计算。其中,坝体按照设置排渗系统和不设排渗系统两种情况考虑,干滩面长度分别为70m(洪水状况)、100m和300m(正常状况)3种情况考虑。通过计算获得了该尾矿库在不同条件下地下渗流的变化规律。计算结果显示,采取坝体排渗措施,能使坝体中的地下水顺利导出,从而有效降低坝体浸润线的位置,有利提高尾矿坝的稳定性。 Yangla copper mine is going to build a new tailings pond for its tailings disposal.The tailings dam is 185.0 m high and centerline method is used to construct the tailings pond.For the stability of the tailings dam,2D-FLOW program is used for the numerical simulation study about the dam seepage.During simulation calculation,different conditions which include a drainage system installed into the dam or not and different beach widths,i.e.70(the flood condition),100,300 m(the normal condition),are considered.Through calculation,the change of the seepage under different conditions is obtained,which shows if the drainage system is installed into the tailings dam,the underground water can be successfully drained out.This can keep the phreatic surface level relatively low,so as to improve the stability of the dam.
出处 《重庆大学学报(自然科学版)》 EI CAS CSCD 北大核心 2012年第7期89-93,共5页 Journal of Chongqing University
基金 国家自然科学基金资助项目(51074199) 高等学校博士学科点专项科研基金(200806110012)
关键词 尾矿 尾矿坝 渗流场 数值模拟 中线法 tailings dams seepage computer simulation centerline method
  • 相关文献

参考文献13

  • 1Rico M, Benflo G, Diez herrero A. Flood from railings dam failures [ J]. Journal of Hazardous Materials, 2008, 154(1/2/3): 79-87.
  • 2Dixon hardy D W, Engels J M. Guidelines and recommendations for the safe operation of railings management facilities [J].Environmental Engineering Science, 2007, 24(5): 625-637.
  • 3Jeyapalan K. Analyses of flow failures of mine railings impoundments [D]. Berkeley, USA: University of California, 1980.
  • 4Zandarin M T, Oldecop L A, Rodriguez R, et al. The role of capillary water in the stability o{ tailing dams [J].Engineering Geology, 2009, 105(1/2): 108-118.
  • 5Rico M, Benito G, Salgueiro A R, et al. Reported taiings dam failures: a review [ the European incidents in the worldwide context [J]. Journal of Hazardous Materials, 2008, 152(2) : 846-852.
  • 6《中国有色金属尾矿库概论》编辑委员会.中国有色金属尾矿库概论[R].中国有色金属工业总公司,1992.
  • 7中华人民共和国国家建设部.ZBJ1-90选矿厂尾矿设施设计规范[S].北京:中国标准出版社,1990.
  • 8中国有色工程设计研究总院,秦皇岛冶金设计研究总院.AQ2006-2005尾矿库安全技术规程[S].北京:煤炭工业出版社,2006.
  • 9梁金建.德兴铜矿四号尾矿库中线法堆坝生产实践[J].中国矿山工程,2008,37(1):15-17. 被引量:7
  • 10赵坚,沈振中.尾矿坝复杂排水系统渗流计算方法的改进[J].河海大学学报(自然科学版),1997,25(2):110-113. 被引量:24

二级参考文献11

  • 1谢春红,水利学报,1995年,12期
  • 2沈振中,1993年
  • 3Barton N,Bandis S,Bakhtar K. Strength deformation and conductivity coupling of rock joints. Int J Rock Mech Sci & Geomech Abstr,1985,22(3):121~140
  • 4Shenain Ge. A governing equation for fluid flow in rough fracture. Water Resource Research,1997,33(11):53~61
  • 5Noorishad J, et al. A finite-element method for coupled stress and fluid flow analysis in fractured rock masses,Int J Rock Mech Sci & Geomech Abstr,1985,22(4):251~281
  • 6李锡夔,Comput Struct,1992年,45卷,211页
  • 7李锡夔,Int J Numer Methods Eng,1990年,30卷,1195页
  • 8Zienkiewicz O C,A rational approach to guantitative solutions Part 2,1990年,311页
  • 9李锡夔.非饱和土中的有效应力[J].大连理工大学学报,1997,37(4):381-385. 被引量:6
  • 10段小宁,李鉴初,刘继山.应力场与渗流场相互作用下裂隙岩体水流运动的数值模拟[J].大连理工大学学报,1992,32(6):712-717. 被引量:15

共引文献73

同被引文献130

引证文献9

二级引证文献54

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部