摘要 两水隧道为双线铁路隧道,穿过志留系千枚岩地层,施工中多处出现大变形,反复出现初期支护侵限,安全风险高,施工难度极大。由于有针对性地采取了调整支护参数、加大变形预留量、自进式长锚杆锁脚、微台阶施工工艺等变形控制措施和施工技术,有效地控制了大变形。文章分析了两水隧道高地应力软岩特点和大变形特征,对高地应力软岩隧道施工进行了有益的探索。 The construction of the double-track Liangshui tunnel passing through the phyllite strata of the Silurian system was risky and difficult since deformation occurred at several places and the primary support invaded the clearance. Some measures taken to address these issues included parameter adjustment, larger deformation allowance, self-drilling long anchoring, and micro-bench construction technology. This paper analyzes the features and deformation characteristics of the soft rock with high ground stress around the Liangshui tunnel.
作者 吴广明
出处 《现代隧道技术》 EI 北大核心 2012年第4期94-98,共5页 Modern Tunnelling Technology
关键词 铁路隧道 高地应力 软岩 变形控制 Railway tunnel High ground stress Soft rock Deformation control
  • 相关文献

参考文献4

二级参考文献9

共引文献35

同被引文献286

引证文献39

二级引证文献256

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部