期刊文献+

夯实基础 创新管理 全力打造世界一流水电工程

Laying a Solid Foundation and Innovating Management System to Construct World-class Hydropower Project
下载PDF
导出
摘要 糯扎渡水电站是澜沧江中下游梯级的核心工程,也是华能集团创建世界一流水电建设项目的试点工程。其工程规模巨大,面临的许多技术、施工难题超出了国内已有的技术储备。工程建设过程中,华能澜沧江水电有限公司立足管理创新、技术创新,攻克了诸多技术及施工难题,为我国高心墙堆石坝及大型水电工程的建设积累了经验,为创建世界一流水电工程奠定了坚实的基础。 As a hydropower station with greatest installed capacity and largest reservoir capacity on Lancang River, Nuozhadu Hydropower Station has become the core project among the cascade hydropower stations on the middle and lower reaches of River, as well as the pilot project of China Huaneng Group in constructing world-class hydropower projects. Due to its huge construction scale, the development of Nuozhadu Hydropower Station has been faced with a series of technological and constructing difficulties which have exceeded existing domestic technological reserves. During the construction of Nuozhadu Hydropower Station, HydroLancang has conquered these difficulties by management and technological innovations. The construction of Nuozhadu Hydropower Station has provided valuable experiences for developing high core rockfill dams and large-scaled hydropower projects in China, and has also laid a solid foundation for constructing a world-class hydropower project.
作者 王永祥
出处 《水力发电》 北大核心 2012年第9期1-4,共4页 Water Power
关键词 水电建设 创新管理 水电工程 糯扎渡水电站 hydropower construction management innovation hydropower engineering Nuozhadu Hydropower Station
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部