摘要 糯扎渡水电站绿色水电工程建设规划从生态环境保护和修复、环境保护管理、关键技术问题研究3个方面展开。介绍了糯扎渡绿色水电工程建设规划的意义、概念、指标和主要内容,并且概要说明了糯扎渡水电站建设过程中实施绿色水电工程建设规划的基本情况。实践表明,规划及其实施对于糯扎渡水电站和澜沧江流域水电开发实现可持续发展目标提供了支持,也可以为我国水电行业生态环境保护工作的深入开展提供有益的借鉴。 The green hydropower planning of Nuozhadu Hydropower Station Project is carried out from three aspects of eco- environmental protection and rehabilitation, environmental protection management and key technology of researches. The implication, concept, indicators and main contents of green hydropower planning of Nuozhadu project are introduced herein, and the implementation of green hydropower planning during the construction of Nuozhadu project is also briefly illustrated. The practice shows that the green hydropower planning and its implementation can support the sustainable development of Nuozhadu project and other hydropower utilization in Lancang River basin, and meanwhile, provide a helpful reference for the depth of ecological and environmental protection in Chinese hydropower industry.
作者 袁湘华
出处 《水力发电》 北大核心 2012年第9期5-8,共4页 Water Power
基金 国家科技支撑计划项目(2011BAC09B07)
关键词 绿色水电 规划 实践 糯扎渡水电站 green hydropower, planning practice Nuozhadu Hydropower Station
  • 相关文献

参考文献6

二级参考文献14

共引文献32

同被引文献16

引证文献3

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部