摘要
随着铁路的发展,新建、改建铁路不断增多,一些既有铁路信号楼需要搬迁。针对信号楼搬迁引起的通信系统改造方案进行介绍,重点阐述通信系统改造开通前的准备和试验流程。
With the development of the railways, the number of newly built and rebuilt railways increases and some existing railway signal buildings are required to be moved. In this paper, It's mainly introduced the renovation scheme of communication system caused by signal building relocation, the preparation and the testing process before the open of the communication system after a transformation are completed.
出处
《铁道通信信号》
2012年第8期71-73,共3页
Railway Signalling & Communication
关键词
铁路信号楼搬迁
通信
改造
Railway signal building relocation
Communication
Transform